projects

Swansea Enterprise Zone  Deeside Industrial Park  Llanelli Coast Improvements  Baglan Energy Park

Llanelli Coast Improvements

Client: Llanelli Borough Council

Since 1990 the Llanelli Joint Venture group has been carrying out a phased improvement to a 3 mile stretch of the coastline immediately bordering the town environs. Aims of the project have been to;

  • Stabilise the coastal strip.
  • Provide new attractive beach environments for leisure and tourism.
  • Create, a high quality coastal edge behind which diverse new development can be established.

Artificial breakwaters have been formed reaching out into the Loughar Estuary between which new beaches have been created utilising imported sand. A 6m wide promenade was then created to an attractive curving line up to which new development can now take place. The old dock approaches were dredged and a new wharf area created for boat users.

TACP were involved in advising on aspects of function and aesthetics throughout much of its length, particularly in relation to the promenade.

We are also involved in the masterplanning of the adjoining first phase of development, a combination of high quality housing, leisure and tourism provision.

Llanelli Coast Improvements [90K] Llanelli Coast Improvements [71K]

Llanelli Coast Improvements [83K] Llanelli Coast Improvements [86K]

<< back


Site designed by: StudioBlue, © 2001.